Work Order Progress Event Allowed Change Screen

Data is captured on the following tab(s) of the edit screen: Overview. Below is a list of descriptions for the fields in the sections on each tab.

Overview

The Overview tab contains the following section(s):

Header

  • Progress Event: The work order progress event for which an allowed event is being specified.
  • Allowed Event: The event to which the Progress Event value can be changed.
  • Permission Tree: A field linked to a permission record in a permission tree, that determines whether a user has rights to access records and/or make changes to records. This is assigned by the system where possible.
  • Sequence Number: The sequence in which the records are listed. Use the sequence number to list the records in a logical sequence.
  • Is Active: Ticked if the record is active and available in lookup lists.

Notes

Add additional details, comments or other relevant information.

Modification

Displays details of when the record was created and last updated. This section is autopopulated and requires no user input.